Permission Information
a) Why Permission is Required?
In order to maintain smooth flow of Traffic, to ease congestion, to prevent danger and to reduce inconvenience to the public in Hyderabad Commissionerate limits, the Commissioner of Police, Hyderabad City has issued, prohibitory orders, on plying of certain class of vehicles in Hyderabad City Commissionerate limits. The concerned persons of such class of vehicle, who desires to ply their vehicle for some inevitable reasons during the restricted hours, needs to apply for permission.
b) Whom to Apply for Permission?
SI. No | Permission | Application To |
---|---|---|
1 | Petrol Pump (Installation/Renewal) | The Commissioner of Police, Hyderabad. |
2 | Cinema Theaters (Installation/Renewal) | The Commissioner of Police, Hyderabad. |
3 | Tambola License (New/Renewal) | The Commissioner of Police, Hyderabad. |
4 | Religious Processions, Rallies, Walkathons | The Commissioner of Police, Hyderabad / Jt. Commissioner of Police, Traffic, Hyderabad / Dy.Commissioner of Police of the concerned zone. |
c) What is the procedure for applying for permission for petrol pump?
The person, who desires to apply for permission for Petrol Pump has to give the application addressing to the Commissioner of Police, Hyderabad along with the required documents mentioned below.
Checklist of Required Documents
- Application in Form –IX(Copy of Format enclosed) (Mandatory)
- Application in Form-IA (Copy of Format enclosed to be uploaded by the applicant as per requirement) (If available)
- Site Plan/Layout (Mandatory)
- Letter of acceptance from the company(LOI) Letter of Intent (Mandatory)
- MOU (Memorandum of understanding) of the Company. (If available)
- Sale Deed and Link Documents of Land (Mandatory)
- Rental/Lease Agreement of land premises. (If available)
- Pre approval letter of Dy.C.C. Explosives (PESO) Petroleum and Explosives Safety Organization to be enclosed wherever Mandatory. (If available)
- Latest Municipal permission/Gram Panchayath. (If available)
- NOC from all surrounding neighbours in original. (Original, Mandatory)
- ID Proof and Residential proof of the applicant. (Mandatory)
- Partnership Deed if any. (If applicable)
d) Required Parameters
SI. No | Parameters | Only MS (Petrol) with 2 Delivery Units | MS (Petrol) HSD (Diesel) with 2 delivery units each | MS (Petrol) and HSD (Diesel) &LPG with 2 delivery units each | |||
---|---|---|---|---|---|---|---|
Existing Norms | New Norms | Existing Norms | New Norms | Existing Norms | New Norms | ||
1 | Minimum Area Required | 600 Sq. Meters (or) (717.6 Sq. Yards) |
600 Sq. Meters (or) (717.6 Sq. Yards) |
800 Sq. Meters (or) (956.6 Sq. Yards) |
900 Sq. Meters and every additional single delivery unit 50 Sq. Meters of area should be increased |
800 Sq. Meters (956.6 Sq. Yards) |
1000 Sq. Meters and every additional single delivery unit 50 Sq Meters of area should be increased |
2 | Minimum Opening Required (Entry & Exit) | 25 Meters or 82.02 Feet | 30 Meters | 25–30 Meters (82.02 Feet) |
35 Meters | 25 Meters (82.02 Feet) |
35 Meters |
3 | Minimum Road Width | 60 Feet (or) 18.29 Meters | |||||
4 | Distance from Junction | 100 Meters (or) 328.08 Feet | 100 Meters | 100 Meters (or) 328.08 Feet | 100 Meters | 100 Meters (or) 328.08 Feet | 100 Meters |
New Parameters / Norms as per the guidelines of Ministry of Road Transport and Highways vide No.RW-NH-33032/01/2017 — S&R (R), dt.26-06-2020:
SI. No | Parameters | New Norms for only MS (Petrol) with 2 delivery units | New Norms for MS (Petrol) and HSD (Diesel) with 2 delivery units each | New Norms for MS(Petrolj, HSD (Diesel) and LPG with 2 delivery units each |
---|---|---|---|---|
1 | Acceleration / Deceleration lane may be dispensed with for the fuel stations located along urban roads | The deceleration and acceleration lanes may be dispensed with for the fuel stations located along urban roads | ||
2 | Intersection with any category of road and median Gap | 100 Meters | 100 Meters | 100 Meters |
3 | Any Barrier including that of Toll Plaza and Railway Level Crossing | 1000 Meters | 1000 Meters | 1000 Meters |
4 | Start of approach road of Road over Bridge flyover | 300 Meters | 300 Meters | 300 Meters |
5 | The distance between Fuel stations | 300 Meters | 300 Meters | 300 Meters |